Page header

3MW (2025)

Al Ain, Abu Dhabi, UAE3 MW
已完成

3MW (2025)
Profit per kWh$0.0120
Est. Payback35 Months
Total Capacity3 MW
Target Raise$750,620

Investor Profitability

$0.0120 / kWh

Every kilowatt-hour consumed at this facility generates a direct profit share for infrastructure owners. This margin is locked in via long-term energy contracts.

Est. Payback Period

35 Months

Based on a $1,000 reference investment. Your capital is returned through facility usage payments (CAPEX) and ongoing energy revenue shares.

O tomto projekte

The 3 MW transformers are already installed and funded by the company, eliminating the typical 3–4 month power setup delay. Pooled funds are used to recover this cost and execute the next phase, including ordering and installing hydro containers, RO plants, water systems, accommodation, and launching sales.

Key Terms

Percentuálny podiel na príjmoch z platieb za elektrinu od hostovaných klientov.
Výplaty mesačne, podľa skutočných príjmov a uptime.
Non-custodial; prostriedky sú vyhradené iba na CAPEX/OPEX zariadenia.
Podrobné dokumenty sú dostupné po schválení KYC.

Životný cyklus

Funding
Building
Partially operational
Fully operational
Filled by miners

Roadmap projektu

Zhrnutie projektu

Rozpis nákladov

Stratégia realizácie

The 3 MW power infrastructure for this project is already completed and fully funded by the company. All 3 MW transformers have been installed, energized, and are operational, eliminating the usual 3–4 month waiting period associated with transformer approvals and installation. This means co-investors are entering a ready-power site, where execution can move immediately to the revenue-generating phase. Current Status • ✅ 3 MW transformers installed and funded • ✅ Power available at site • ✅ Electrical approvals and readiness completed Next Execution Phase With power already live, the execution focus shifts to: • Ordering and installing hydro-cooling mining containers • Completing RO plant setup and water treatment • Installing water storage tanks and borewell • Finalizing worker accommodation • Completing fencing, security, and site infrastructure • Launching miner sales and hosting operations Because the transformer stage is already complete, clients and co-investors do not face long infrastructure delays, enabling faster deployment and earlier cash flow.

Záver

The pooled investment funds will be utilized to: • Recover the company’s upfront capital used for the installation of the 3 MW transformers • Support the immediate execution of remaining infrastructure, including: • Hydro-cooling containers • RO plants and water systems • Water storage and borewell • Worker accommodation • Fencing, security, and operational facilities The site is fully power-ready, and the project is now positioned for rapid deployment and scaling, with recovered capital being recycled into upcoming expansion projects. This structure significantly reduces execution risk, shortens time to revenue, and ensures efficient capital utilization for all stakeholders.

您等待的每一天都是您损失的收入

好奇?让我们连接来回答您的问题。