Page header

3MW (2026)

Al Ain, Abu Dhabi, UAE3 MW
Aberto para investimentos

3MW (2026)
Profit per kWh$0.0103
Est. Payback36 Months
Total Capacity3 MW
Target Raise$796,621

Investor Profitability

$0.0103 / kWh

Every kilowatt-hour consumed at this facility generates a direct profit share for infrastructure owners. This margin is locked in via long-term energy contracts.

Est. Payback Period

36 Months

Based on a $1,000 reference investment. Your capital is returned through facility usage payments (CAPEX) and ongoing energy revenue shares.

Sobre este projeto

A fully operational 3 MW mining facility delivering immediate revenue, with infrastructure completed in advance to eliminate delays and reduce execution risk.

Key Terms

Percentual de partilha de receitas sobre os recebimentos de eletricidade de clientes alojados.
Distribuições mensais, sujeitas aos recebimentos efetivos e ao uptime.
Não custodial; fundos reservados apenas para CAPEX/OPEX da instalação.
Documentação detalhada disponível após aprovação de KYC.

Ciclo de vida

Funding
Building
Partially operational
Fully operational
Filled by miners

Roteiro do projeto

1
Infrastructure Development (Completed)
• 3 MW power infrastructure fully funded and installed • Transformers installed, energized, and operational • Complete site development including hydro-cooling, RO plant, water systems, security, and accommodation
2
Commissioning & Testing (Completed)
• Full system testing and validation completed • Stress testing conducted using in-house miners • Operational stability and performance optimization achieved
3
Deployment & Monetization (Active)
• Hydro-cooling mining containers installed and operational • Miners deployed across the facility • Clients onboarded under hosting at 6 cents • Revenue generation commenced from the first month
4
Optimization & Stabilization (Ongoing)
• Continuous performance monitoring and efficiency improvements • Operational cost optimization and system fine-tuning • Strengthening uptime, reliability, and service quality

Resumo do projeto

13 MW power infrastructure fully funded and operational
2Site fully developed with all supporting infrastructure in place
3Miners deployed and clients onboarded at 6 cents
4Revenue generation started from the first month
5Low-risk, operational, and cash-flow-generating asset

Discriminação de custos

Electrical Aprovals and Drawings
$27,793
Electrical Infrastructure
$369,210
TAQA Connection Fees
$180,000
Boundry Wall, Accomadation, Borewell, and RO Plant
$69,618
Hydro Cooling Container
$150,000

Estratégia de execução

The project follows a front-loaded infrastructure strategy, with the 3 MW power setup fully funded and operational, eliminating typical delays. The facility is fully active, with miners deployed and clients onboarded at 6 cents, enabling profit generation from the first month. This allows co-investors to enter a live, revenue-generating asset with reduced execution risk. The strategy focuses on: Immediate monetization through an active hosting model Efficient capital utilization via pre-funded infrastructure Rapid onboarding without infrastructure bottlenecks Overall, the project is positioned as a low-risk, operational, cash-flow-generating investment delivering immediate returns.

Conclusão

The project is fully developed, operational, and revenue-generating, with all core infrastructure completed and miners actively running. Pooled investment participation is structured to enable recovery of the company’s initial capital invested in establishing this facility, while offering entry into a live project with immediate cash flow. This approach significantly reduces execution risk and allows stakeholders to benefit from a stable, operational asset from day one.

Cada Dia que Espera é Receita que Perde

Curioso? Vamos falar para responder às suas perguntas.