Page header

Investment Projects

Explore current infrastructure opportunities available for investment.

3MW (2025)
完了

3MW (2025)

Al Ain, Abu Dhabi, UAE3 MW

The 3 MW transformers are already installed and funded by the company, eliminating the typical 3–4 month power setup delay. Pooled funds are used to recover this cost and execute the next phase, including ordering and installing hydro containers, RO plants, water systems, accommodation, and launching sales.

調達済み$750,620 / $750,620
100%
3MW (2026)
投資受付中

3MW (2026)

Al Ain, Abu Dhabi, UAE3 MW

A fully operational 3 MW mining facility delivering immediate revenue, with infrastructure completed in advance to eliminate delays and reduce execution risk.

調達済み$0 / $796,621
0%
25 MW
近日公開

25 MW

Al Ain, Abu Dhabi, UAE25 MW

WeConnect’s roadmap is aligned with the UAE’s clean energy goals. The company aims to build one of the world’s most sustainable 200 MW cryptocurrency hosting ecosystems by integrating nuclear, grid, and solar power sources — ensuring that every kilowatt serves a productive, transparent, and environmentally responsible purpose.

調達済み$0 / $6,153,164
0%
このプロジェクトは近日公開です。投資ラウンドが開始され次第、詳細をお知らせします。

Iga päev, mil ootad, on tulu, mille kaotad

Huvitatud? Võta ühendust, et vastata sinu küsimustele.