Page header

Investment Projects

Explore current infrastructure opportunities available for investment.

3MW (2025)
Завершана

3MW (2025)

Al Ain, Abu Dhabi, UAE3 MW

The 3 MW transformers are already installed and funded by the company, eliminating the typical 3–4 month power setup delay. Pooled funds are used to recover this cost and execute the next phase, including ordering and installing hydro containers, RO plants, water systems, accommodation, and launching sales.

Сабрана$750,620 / $750,620
100%
3MW (2026)
Адкрыта для інвестыцый

3MW (2026)

Al Ain, Abu Dhabi, UAE3 MW

A fully operational 3 MW mining facility delivering immediate revenue, with infrastructure completed in advance to eliminate delays and reduce execution risk.

Сабрана$0 / $796,621
0%
25 MW
Хутка

25 MW

Al Ain, Abu Dhabi, UAE25 MW

WeConnect’s roadmap is aligned with the UAE’s clean energy goals. The company aims to build one of the world’s most sustainable 200 MW cryptocurrency hosting ecosystems by integrating nuclear, grid, and solar power sources — ensuring that every kilowatt serves a productive, transparent, and environmentally responsible purpose.

Сабрана$0 / $6,153,164
0%
Гэты праект рыхтуецца да запуску. Падрабязнасці будуць прадастаўлены пазней, калі інвестыцыйны раўнд будзе адкрыты.

Кожны дзень чакання — гэта страчаны даход

Цікава? Давайце звяжамся, каб адказаць на вашы пытанні.