Page header

Investment Projects

Explore current infrastructure opportunities available for investment.

3MW (2025)
مكتمل

3MW (2025)

Al Ain, Abu Dhabi, UAE3 MW

The 3 MW transformers are already installed and funded by the company, eliminating the typical 3–4 month power setup delay. Pooled funds are used to recover this cost and execute the next phase, including ordering and installing hydro containers, RO plants, water systems, accommodation, and launching sales.

المجموع المجموع$750,620 / $750,620
100%
3MW (2026)
مفتوح للاستثمارات

3MW (2026)

Al Ain, Abu Dhabi, UAE3 MW

A fully operational 3 MW mining facility delivering immediate revenue, with infrastructure completed in advance to eliminate delays and reduce execution risk.

المجموع المجموع$0 / $796,621
0%
25 MW
قادم

25 MW

Al Ain, Abu Dhabi, UAE25 MW

WeConnect’s roadmap is aligned with the UAE’s clean energy goals. The company aims to build one of the world’s most sustainable 200 MW cryptocurrency hosting ecosystems by integrating nuclear, grid, and solar power sources — ensuring that every kilowatt serves a productive, transparent, and environmentally responsible purpose.

المجموع المجموع$0 / $6,153,164
0%
هذا المشروع قادم قريبًا. سيتم توفير التفاصيل لاحقًا بمجرد فتح جولة الاستثمار.

كل يوم تنتظر فيه هو إيرادات تخسرها

فضولي؟ لنتواصل للإجابة عن أسئلتك.